AMG & The Grove School Councils Present

Building a better
schoolyard, together

We’re on a mission to raise $300,000 to start our schoolyard transformation. Together, we’ll create a safe and engaging landscape where every child at AMG and The Grove can run, climb, dig, dream — and just be a kid.

A Space That Moves With Us.

The schoolyard at AMG and The Grove is the heartbeat of our neighborhood — a place where over 500 students and local families gather every single day.

But for too long, this vital space has been overlooked. While our community has grown and changed, our yard has remained frozen in time, with a worn-down field, cracked asphalt, and aging infrastructure that no longer serves the energy or the needs of our kids.

Finally, the transformation is underway. This summer, while the TDSB kicks off essential field upgrades, we are launching Phase 1 of our Revitalization Project. Our mission is to raise $300,000 to transform our unused, run-down tennis courts into a safe, high-energy multi-sport hub for everyone. This is the first bold step toward a revitalized yard that finally reflects the vibrant community we’ve built together.

Student artwork lining the schoolyard fence

Track the Transformation

Every dollar makes a difference. Help us reach our goal!
Note: This thermometer is updated weekly, not automatically!

$0
of $300,000 goal 0%
0 families and counting
$300,000
$75,000
$150,000
$225,000

The Road Map to Revitalization

Every dollar goes directly toward igniting our schoolyard.

🌱

Field Upgrades

Repairing the drainage system, resodding the grass, redesigning the baseball diamond, and splitting the field into two soccer areas.

Multi-Sport Hub Infrastructure

Converting the tennis courts, including a full asphalt repavement, line painting, and fence improvements.

🥅

Multi-Sport Hub Equipment

Setting up the new space with gaga ball pits; hockey, soccer, and pickleball courts; sports equipment and a storage shed.

🛝

Phase 2: Future Initiatives

We’ll be looking at getting a new or additional play structure!

Project Timeline

Key milestones on the road to a brand‑new schoolyard.

MAY 2026

Fundraising campaign launch!

*TDSB Review Process is currently ongoing. Final design and full cost breakdown will be available in June.

May 2026

AMG Day Online Silent Auction

Auction will be live from May 8 – May 24. Our goal is to raise over $10,000 towards Phase 1.

June 2026

AMG Day Fundraiser

Community celebration and our biggest fundraising event of the year.

Summer 2026

TDSB-Funded Field Upgrades

Board-funded construction starts during summer break.

FALL 2026

New Field is Ready for Play!

Students return to a brand-new green field for the fall.

2027 and beyond

Phase 1 (Multi-Sport Hub) Construction

Multi-sport hub is built, including gaga ball pits, hockey/soccer/pickleball courts, and an equipment shed.

Be Part of Something Amazing

Whether you can donate, volunteer your time, or simply spread the word — every bit helps.

💰 Make a one-time or recurring donation

💪Volunteer at a fundraising event or join the planning committee

📣 Share our campaign with friends & neighbours

🎯 Sponsor our main event of the year: AMG Day

Get in touch

← Back

Thank you for reaching out.

We’ll be in touch soon!